This year, I’m doing something simple and public.

I’ve put together a list of 23 First-of-a-Kind climate tech projects that are supposed to hit meaningful milestones in 2026 — commissioning, certification, first operations, or first proof that the business case holds outside a slide deck.

I’ll be monitoring these projects throughout the year and sharing monthly updates on what actually moves, what stalls, and what quietly changes scope.

Below is the starting snapshot.

FOAK projects I’ll be tracking in 2026

# Project Location Expected development, 2025–26 Current status
1 H2 Green Steel Sweden First commercial fossil-free steel production Under construction
2 HYBRIT DRI Demo Sweden Commercial investment decision Demo validated
3 ArcelorMittal Hamburg DRI Germany Hydrogen-based DRI commissioning Under construction
4 Nucor Louisiana DRI USA Low-carbon DRI steel production Under construction
5 Linglong One (SMR) China Grid-connected SMR commissioning Construction completed
6 Kairos Hermes Reactor USA First non-power reactor operation Construction started
7 Commonwealth Fusion – SPARC USA Net-energy demonstration attempt Construction ongoing
8 Climeworks Mammoth DAC Iceland Stable full-capacity operation Ramp-up
9 Occidental STRATOS DAC USA 500 ktpa DAC commissioning Under construction
10 Net Zero Teesside CCS UK CCS hub commissioning Construction
11 Acorn CCS UK CO₂ transport & storage Phase 1 Development
12 Brevik CCS (Cement) Norway Full industrial CCS operation Commissioning
13 Talos Bayou Bend CCS USA First commercial CO₂ injection Permitting
14 Project Tundra CCS USA Coal CCS operation Late development
15 Eavor-Loop Geothermal Germany Closed-loop geothermal operation Wells drilled
16 Form Energy Iron-Air USA Multi-day grid storage operation Construction
17 Energy Vault EVx China Gravity storage replication First system live
18 LanzaJet Freedom Pines USA SAF production scale-up Operational
19 NEOM Green Hydrogen Saudi Arabia Integrated H₂–ammonia commissioning Under construction
20 ACME Odisha Green Ammonia India Green ammonia production Construction
21 ATOME Villeta Paraguay Green fertiliser production EPC & financing
22 ZeroAvia UK / USA Hydrogen-electric flight certification Flight testing
23 Lyten (ex-Northvolt facilities) Sweden Lithium-sulfur battery production restart at Northvolt facilities Retooling

What this table already tells us

1. Steel, hydrogen and CCS dominate — again (facepalm)

Heavy industry decarbonisation is still where FOAK capital clusters:

  • DRI steel
  • hydrogen supply chains
  • carbon capture and storage.

That’s not because they’re easy — but because people thought they would be easy. 2026 might well become the year where dreams of hydrogen, CCS and green steel finally crash against hard reality. Green steel though, might avoid this fate in the EU, thanks to CBAM going full-steam.

2. Integration risk outweighs technology risk

Very few of these projects are betting on unknown physics, although many CCS and hydrogen do believe they can change its laws.
Most are betting on:

  • EPC discipline
  • supply-chain reliability
  • permitting
  • offtakers having nerves of steel
  • and the ability to survive delays without balance-sheet collapse.

In other words: classic FOAK failure modes.

3. Regulation and certification loom large

Projects like aviation hydrogen, nuclear, CCS hubs — they don’t fail in labs.
They fail in when regulatory approvals last longer than investors’ patience.

Which brings me to the ones I’ll be watching especially closely.

Projects I’m personally watching — with raised eyebrows

Lyten taking over Northvolt’s facilities
This is one of the most interesting experiments on the list.
Not a greenfield dream — but a brutal attempt to make someone else’s broken factory work with a new chemistry.
If this succeeds, it will say more about execution than battery science.

ZeroAvia
This year feels existential.
Certification timelines, cash burn, and customer patience will all collide.
Hydrogen aviation doesn’t get infinite “almost there” years.

Climeworks
Direct Air Capture is past the storytelling phase. Last year dismal results put forward simple and uncomfortable question:
Can Mammoth operate reliably, predictably, and economically — or does scale just magnify the problems?

NEOM Green Hydrogen
A masterclass in ambition and capital availability, or, I’d say, ability to seperate capital from investors.
Also a masterclass in how many things must go right simultaneously.
I’m not watching for technology — more for governance, interfaces, reality checks, and how to keep a smooth face in a loosing game.

Commonwealth Fusion
Fusion is like Schrödinger’s cat - it is simultaneously alive and dead. This year I’m watching how CMF will be inflating its promises as it inevitably heads for collapse.

How I’ll use this list

  • Monthly status checks
  • Quiet changes in scope and language
  • Delays vs real progress
  • And, occasionally, calling things what they are

No cheerleading. No doomposting.
Just FOAKs as they are — fragile, expensive, necessary.

If you’re building, financing, or betting on FOAKs:
you already know the truth (or should) — execution is the product.

More to come this month.