Writing /
Business case: hydrogen
Your startup is no longer about technology after your technology successfully completes laboratory trials. You’ve already proven that the tech works. It is even no longer about investments. Investors will line up if technology is working, you have reasonable value propositions, and you are from the currently hyped-up sector. Your startup is now just about two things:
1. Realistic business case
2. Execution
In my posts, I’ve talked at length about execution. There is still much more to talk about, but today, I want to get back to basics and talk about the viability of a business case. I haven’t put out a dedicated post on it yet. There was a post about value proposition, but the business case is not the same as a value proposition. Value proposition only shows the potential of your technology. This potential is not likely to be demonstrated during your First-of-a-kind (FOAK) project. It will be realized only after you’ve deployed your technology at scale again and again.
Business case is about making money on your FOAK, or at least on your second or third of a kind. It is about demonstrating that you rely on suppliers, survive the competition, and still make money. Your ability to show this depends on how many risks are under your control and how many risks you can’t cover. The fewer risk factors are outside your control, the more solid will be your business case. Let’s take a deeper look at the green hydrogen business case.
To produce green hydrogen, you need to go through a process called electrolysis. To produce green hydrogen, you use a process called electrolysis, in which electricity from renewable sources splits water (H₂O) into hydrogen (H₂) and oxygen (O₂) inside an electrolyzer. Renewable energy sources are essential here. If you use gas or coal power to make hydrogen, it will not be “green”. How much renewable energy do you need? The picture below gives an illustration of a typical hydrogen project capital cost breakdown.
Power investments take half the balance of the plant. Technology-specific investments take 45% of total investments. From this angle, you seem to control about half of the costs, assuming that you are in good relationships with electrolyzer manufacturers or you are making one yourself.
As you will not be selling a completed green hydrogen facility, but rather kilograms of hydrogen, it would pay to look at your operational expenditure. And here, energy costs can make up for more than 80% of your OPEX
If we remember that half of CAPEX costs are Balance of Plant costs, in reality, you control only about a third of total costs. The picture above demonstrates that building a green hydrogen project is simply banking on the cost of capital and cost of energy.
To me, this is a very poor business case. You are in a capital-intensive business, and you have no control over 80% of your costs. Of course, you can lock in energy prices with long-term power purchase agreements, but those will still make up the bulk of your costs. Maybe you are better off just investing in renewable energy.
And here we come to the second question - whether you can survive competition. Current competition sells hydrogen, made with energy from coal or gas, at prices of $1,5-2 per kilogram. To realistically beat them, you need to achieve a price of at least $1,5 per kilogram. The above infographics show that current projects can deliver at best $5 per kilogram.
Let’s look into energy again. It takes, on average, 55 kWh of energy to produce 1 kg of hydrogen. For green hydrogen to reach costs of at least $1,5 per kilogram, electricity has to be cheaper than $0,02 per kWh. Some existing power plants, especially hydropower plants, can achieve these values. Solar power can also achieve it, but needs to be at a massive scale. This still won’t work for hydrogen, as solar power is intermittent, and an electrolyzer needs to work round the clock. Adding battery storage will immediately drive energy costs over the $0,02 per kWh threshold.
Green hydrogen doesn’t check the two boxes for a solid business case - weak control over capital costs and supply chain and inability to beat the competition, again, due to the lack of control over operational expenditure. Hoping for the price of electrolyzes and renewable energy to go down doesn’t make your business case any more solid, at least not at the moment. If and when they do go down, the business case might become more attractive. However, the price of renewables and batteries has been flattening out recently, and it is not clear how fast the prices will drop by half, if at all. Overcapacity in electrolyzer manufacturing has brought down the costs, but it is not clear whether there will be any other cost reductions soon.
Scaling Cleantech: Learn from Green Hydrogen’s Business Case Failure
Taking your cleantech startup from the lab to your first-of-a-kind (FOAK) facility is a huge leap. But before you start thinking about scaling, you need to answer one crucial question: Does your technology have a viable business case?
Green hydrogen is a perfect example of what happens when the business case doesn’t exist. Despite billions in investment and massive political backing, it still struggles to make economic sense. If you’re building a FOAK, you need to avoid the same traps.
Why Green Hydrogen is Struggling
The numbers don’t lie:
Electricity costs dominate. Nearly 80% of green hydrogen’s operational costs come from electricity. Unless you have ultra-cheap, round-the-clock renewables, your margins disappear.
Capital costs are massive. Almost 50% of CAPEX goes into power infrastructure. Even with declining electrolyzer costs, the investment burden remains high.
It can’t compete on price. Fossil fuel hydrogen costs $1.50-$2 per kg, while green hydrogen struggles to get below $5 per kg. The economics just don’t work—yet.
The Lesson for Cleantech Startups
If you’re scaling a cleantech business, you must ask: Will my business case work in the next 5-10 years? If not, then maybe it’s time to pivot.
The world is running out of time. We don’t need tech that might be viable in 2040. We need scalable solutions now. If your startup relies on a cost breakthrough or market shift that won’t happen for another decade, consider launching something that can scale up today.
Green hydrogen might become competitive one day—but we don’t have time to wait. The climate clock is ticking. Are you building something that can scale in time?